Redundant Disinefection

In the event of an ozone system failure, primary disinfection can be achieved with chlorination.

A chlorine contact tank situated downstream of the filters and upstream of the existing clearwells is planned to achieve redundant disinfection in conjunction with raw water ozonation.

This 1 million gallon CCT is sized to provide a minimum of 0.5 log giardia inactivision and 2-log virus inactivation while operating at the maximum flow rate.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s